Projects

Contaminated Land Investigation at Warwick Railway

Contaminated Land Investigation at Warwick Railway

Yarramine was engaged by Watco Australia to conduct a due diligence Contaminated Land Investigation (CLI) at the Warwick Railway on Lyons Street, Warwick. The site is listed on the Environmental Management Register (EMR) and the investigation was requested to establish baseline soil contamination levels prior to Watco Australia's lease-based occupation of the site.

To meet this request, an investigation of the site’s property history was undertaken to identify potential contaminants and areas of environmental concern as well as conducting a limited sampling and testing program to assess whether the site posed a contamination risk.

  Client: Watco Australia
  Start Date: June 2019
  End Date: July 2019
  Expertise: Contaminated Land
 
 
 

 

 

Date

01 April 2025

Tags

Contaminated Land
Let's Talk - 1300 053 103

Subscribe

Copyright © 2024 Yarramine Enivronmental | ABN 84 125 672 442 |  All Rights Reserved

Website Design by NPK
line-shape line-shape